What is the definition of overhead?

  • Expenses associated with operating buildings and equipment, including rent, insurance, utilities, and repairs.
  • Learn more about overhead in the class "Metrics for Lean 230" below.

Metrics for Lean 230

Quality Training


Class Information
ToolingU.com classes are offered at the beginner, intermediate, and advanced levels. The typical class consists of 12 to 25 lessons and will take approximately one hour to complete.
Class Name:Metrics for Lean 230
Description:This class describes the most common metrics used to measure timing, error, and costs and encourage continuous improvement in a lean system. Includes an Interactive Lab.
Prerequisites: 900130  900160 
Difficulty:Intermediate
Number of Lessons:16
Language:English
  

Below are all the competencies and job programs that contain the class Metrics for Lean 230. Job programs are our traditional class lists organized according to common job functions. Competencies are our latest job-specific curricula that help tie online learning to practical, hands-on tasks.

Click on any title to view its details.


Class Outline
  • Objectives
  • What Are Metrics?
  • Traditional Manufacturing Metrics
  • Lean Manufacturing Metrics
  • Choosing Metrics
  • Defining Appropriate Metrics
  • Total Time of Operations
  • Takt Time
  • Cycle Time
  • Cell Balancing
  • Overall Equipment Effectiveness
  • First-Time Quality
  • Cost of Operations
  • Deviation
  • Variation
  • Summary
  
Class Objectives
  • Describe the importance of lean metrics.
  • Distinguish between traditional and lean manufacturing metrics.
  • Distinguish among the three levels of value in manufacturing.
  • Describe the most important criteria for choosing lean metrics.
  • Describe effective tactics for defining appropriate lean metrics.
  • Define total time of operations.
  • Demonstrate how to calculate takt time.
  • Define cycle time.
  • Demonstrate how to perform cell balancing.
  • Demonstrate how to calculate overall equipment effectiveness.
  • Demonstrate how to calculate first-time quality.
  • Describe the purpose of cost of operations.
  • Describe the role of deviation in lean manufacturing.
  • Describe how variation relates to lean manufacturing metrics.

Class Vocabulary  
availability     The percentage of time that a machine is actually able to produce parts out of the total time that it should be able to produce. parts This number includes breakdowns, setups, and adjustments.
cell balancing     A method of matching cycle time to takt time in which tasks are broken down into steps that are redistributed until each task requires the same amount of time for completion.
continuous improvement     Replacing ineffective practices with effective ones to attain ongoing, measurable gains. Organizations must constantly measure the effectiveness of processes and strive to meet more difficult objectives to satisfy customers.
cost of operations     A metric that looks at the overall cost of doing business across all departments rather than by individual departments. Cost of operations focuses on wise investment rather than cost cutting.
cycle time     The actual time it takes to perform a task and forward it to the next step. One of the major goals of lean is to match cycle time to takt time.
deviation     The difference between a standard and a result. Lean strives for zero deviation from perfection, which implies zero errors.
first-time quality     A lean metric that indicates to what extent parts are manufactured correctly the first time without need for inspection, rework, or replacement.
kanban     A Japanese word meaning "card signal." It represents any visual method used to show the need for parts or products to be moved or produced in a lean system.
labor costs     Expenses associated with employees, including wages, insurance, taxes, and workers' compensation.
linked cells     A group of work cells tied together using kanban. Parts travel between cells in small batches but are fabricated one at a time within individual cells.
metric     A measured variable that is tracked and can be used to detect errors or variation and make improvements.
non-value added     Activities that do not contribute to the product or the process and should therefore be eliminated. Non-value added steps are waste.
non-value added but essential     Production activities that ensure that the value-added steps have been properly completed. For example, inspection does not contribute to the product, but it is necessary until the process can be improved to the point where inspection can be eliminated.
overall equipment effectiveness     The overall percentage of an equipment's availability, quality, and performance multiplied together. Overall equipment effectiveness is abbreviated OEE.
overhead     Expenses associated with operating buildings and equipment, including rent, insurance, utilities, and repairs.
performance rate     A percentage representing the number of parts produced divided by the machine capacity. This number includes the number of parts produced in a given time, reduced speeds, idling, and short-term stoppage for jams and other problems.
productivity metrics     Measurements that help determine how to make more products with fewer resources, such as producing the most parts with the fewest numbers of employees. Productivity metrics are used in traditional manufacturing.
pull system     A material management system in which parts are not delivered to machines until they are needed. Pull systems are based on actual demand for parts.
quality rate     The percentage of good parts out of the total number of parts produced. This number includes time lost to defects and the time it takes from startup to normal production.
root cause     The origin of a problem rather than just its symptoms.
six sigma     A quality manufacturing method that uses data analysis to eliminate defects. The goal of six sigma is perfection.
takt time     The rate at which the customer requires your company to manufacture products. Takt time is the number of work minutes per day divided by the number of orders per day.
total time of operations     The total time that elapses from the moment raw materials are delivered to the dock to the moment that the finished product is shipped to the customer. Also known as dock-to-dock time.
unit     The nature of the measurable, such as production hour, cell size, or operator.
value     The number or amount of the unit, such as eight production hours, six cells, and 18 operators.
value added     Any part of the production process that improves the product for the customer.
variation     The difference between normal and abnormal. In manufacturing, variation from what is normal can signal that an error has occurred.
wheel dresser     A sharp, elongated tool, often embedded with diamonds, that is held against a spinning grinding wheel for sharpening.

 





Sitemap   |   Terms of Use   |   Privacy   |   Meetings

ToolingU.com
3615 Superior Avenue East
Building 44, 6th Floor
Cleveland, OH 44114
Toll Free: +1 (866) 706-8665

© Copyright 2012 Tooling University, LLC. All rights reserved.